Baxter Industrial Park

Baxter, MN

WSN assisted with the successful EDA funding application and administration for the original industrial park and the subsequent two additions that bring the park to a total of 270 acres. WSN was responsible for the design and construction observation of sewer and water, 100-year stormwater ponds, roadways with curb and gutter, street lighting and controls, entrance and boulevard landscaping, and irrigation.

Where EDA funding was involved, WSN assisted our clients with:

  • Calculation of benefited area drawing & cost per acre
  • Preconstruction meeting at EDA offices in Chicago
  • Construction administration including quarterly reports to EDA, change order review and closeout documentation package
  • Project administration related to Prevailing Wage requirements

 

Industrial Park Layout and Design

Take an aerial tour of a WSN-designed industrial park. (2:20)