THE DIRT PILE SERIES: Make way for precast and steel. Episode 2 — Building Shell

Posted by

This episode features precast concrete panels flying through the air and steel being erected at the Mills Fleet Farm site in Hermantown, MN. Widseth Smith Nolting’s architects and engineers explain what’s involved during this critical stage of the project.

Experience a construction site in a whole new way. Enjoy the ride as you glide above roof joists and weave around construction vehicles. WSN is involved in every aspect of this project, and as you will see, there’s no substitute for experience. Stay tuned for future episodes between now and August 2016, when the store officially opens.